With a couple of weeks left to go before my course I thought I had better crack on with something else.

So I got thinking about a little fenced area. I will do a couple and then a walled one. The first is a wattle one, second will be fence posts and rails and as I said some kind of walled thing.

Here is my start,  the more astute of you may be wondering why there is a ruler at one end and a bloody big weight at the other…. One word…Warping.

I actually used Copydex instead of PVA or Mod Podge. The base itself is pretty thick and it still bloody tried warping… swearing occurred.

So basically it is sitting there until tomorrow on case that helps.

#annoyed!

Anyway these are just full length at the minute.  They will be cut down to between 15 and 20mm depending on what looks right.

Had a long day of training today so not up to much this evening… actually surprised I didn’t have a little snooze.

So the weather is rolling back on with wind and rain expected. Flooding is also expected due to higher tides. A bit of an iconic photo from Last Week’s Apocalyptic rain…

Photo taken by the Peerie Shop… definitely not mine.

In case you aren’t sure, that’s inside the building!

Leave a Reply